This project was constructed in fall of 2021 and consisted of milling the main travel way of runway and replacing with 2200 ton of asphalt. It also involved grinding down the top layer of road and overlaying new asphalt.
This project was constructed in fall of 2021 and consisted of milling the main travel way of runway and replacing with 2200 ton of asphalt. It also involved grinding down the top layer of road and overlaying new asphalt.